Faith-Based Nonprofit · Broomfield, Colorado
A congregation's commitment to energy and sustainability stewardship
Broomfield United Methodist Church · 44,000 sq ft worship & education facility · $320,000 solar expansion · start-to-finish engagement
120 kW
New AC solar capacity
$128K
IRS direct pay (40% ITC)
$750K+
Projected 25-yr energy savings
6
Contractors evaluated
"Dan was absolutely critical to making this solar project a reality under a tight deadline, with start-to-finish engagement and highly professional and experienced work capabilities."
— Pastor Thomas Cross, Broomfield United Methodist Church
Broomfield United Methodist Church is exactly the kind of client that makes a project like this succeed. Under the leadership of Pastor Thomas Cross, the congregation made environmental stewardship a cornerstone of its capital campaign. Pastor Cross and the church staff demonstrated exceptional foresight by securing a grant for a Scope 2 energy audit, establishing a rigorous, data-driven baseline. That organizational commitment set the stage for everything that followed, and made it possible to move from audit to fully contracted project in just ten weeks against a hard federal deadline.
The church's existing 10 kW rooftop array was operating well and provided a foundation to build on. The capital campaign unlocked the opportunity for a transformational 120 kW AC expansion, achieving near net-zero electricity and returning $128,000 in federal tax credits directly to the congregation.
Engagement
-
1Scope 2 audit & baselineAudit findings translated into actionable parameters: 12-month utility analysis (206,902 kWh, $37,899), net metering capacity confirmation, demand charge diagnosis, and IRS Section 6417 elective pay eligibility established for a 501(c)(3) nonprofit.
-
2Financial modelingThree-scenario NPV analysis across system sizes, using NREL degradation and O&M assumptions, EIA rate escalation, and a full 20-year cash flow model — structured for Trustee presentation and decision-making.
-
3Competitive procurementRFP designed and issued to qualified Colorado contractors. Six proposals evaluated on ITC compliance, FEOC equipment documentation, technical design, and normalized $/kW-AC pricing against a non-negotiable July 4, 2026 construction-start requirement.
-
4Xcel Energy incentive programsGuided BUMC through the full Xcel incentive stack: Solar*Rewards C&I REC payment program and Colorado sales tax exemption documentation — layered alongside the federal ITC direct pay.
-
5Contract negotiationSelected contractor's standard agreement aligned with industry standards and strengthened with important client protections — covering warranty terms, insurance requirements, ITC compliance obligations, project management accountability, and cancellation rights.
-
6Board authorization packageComplete Trustee briefing, financial scenarios, redline and clean contract, and internal summary memo — giving leadership everything needed to vote with confidence at the May 15 authorization meeting.
Outcomes
✓
ITC safe harbor confirmed — construction start by July 4, 2026✓
6 contractors evaluated; best-value, fully compliant contractor selected✓
$128,000 IRS direct pay structured and documented for 990-T filing✓
Enrolled in Xcel Solar*Rewards✓
Positive NPV in all three financial scenarios over 20 years✓
Church reserves fully protected — 100% financed through existing lenderEnvironmental Impact
207K
kWh avoided annually
150
metric tons CO₂/yr
32
cars off the road equiv.